Community Infrastructure Levy (CIL)

Community Infrastructure Levy (CIL) - Round 3

Community Infrastructure Levy (CIL) - Round 3
Consultation on Section 3 and 6 of the CIL Draft Charging Schedule (DCS): 7 January 2015 – 19 February 2015

The second stage of the CIL consultation took place from 3 November 2014 to 15 December 2014. During this time it was noted that there were a couple of omissions made in the drafting of the Key Documents including:- 

  • Figure 1 in Section 3 of the DCS showed an incorrect map; 
  • Table 2 in Section 3 of the DCS detailing the Market Areas had been omitted; 
  • Document entitled ‘SPD2 – Summary of Changes’ was referenced in error in Section 6 of the DCS – this document has now been superseded by the published SPD2 consultation document; 
  • The most recent version of the Infrastructure Delivery Plan (Sept 2014) was not uploaded correctly;
  • Minor error found in the Viability Study appraisals (0% AH appraisals run with 10% AH by mistake – these have been re-run and are now included in the revised Viability Study appendices – this error has no impact on the advice of the study and the Viability Addendum Note July 2014 remains unchanged).

The current consultation therefore relates only to Sections 3 and 6 of the DCS, supported by the Infrastructure Delivery Plan (Sept 2014), and the Viability Report (Dec 2014) and associated appendices. An addendum to the Statement of Representations Procedure previously published is also available to reflect these recent amendments.

Key Documents

Sections 3 and 6 of the CIL DCS

Representation Form

Statement of Representations Procedure – Regulation 16 (Addendum Jan 2015)

Infrastructure Delivery Plan (Sept 2014) 

Viability Report and Appendices (Dec 2014

The Council is consulting on the proposed modifications between 7 January 2015 and 5pm on 19 February 2015. To comment on the document online interactive consultation system.

Page last updated: 19/06/2017